• Drayton Valley Bridge – Drayton Valley, AB – Soil conditioning for a new bridge construction.
  • CP Rail maintenance work – Lower Mainland to Fraser Canyon, BC – Structure maintenance and rehabilitation including track work, culvert installation and ballast repairs.
  • ILM Transmission Line – Lower Mainland, BC – On site supply of concrete and construction aggregate for tower foundations on the Eastern segment of the project.

    Project constraints included 40-60km of gravel access roads and helicopter only access sites.

  • Mainland Sand & Gravel – Lower Mainland, BC – Construction aggregate processing.